Isspro R82477 User Manual

Browse online or download User Manual for Sensors Isspro R82477. ISSPRO R82477 User Manual [en] [cs] [fr] [de] [it] [pl] [es]

  • Download
  • Add to my manuals
  • Print
  • Page
    / 2
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
PERFORMAX
Form No. IS167 (Rev. A 03/11/2008)
ISSPRO, INC.
2515 N.E. Riverside Way
Post Office Box 11177
Portland, Oregon 97211-1899
503-288-4488
800-888-8065
Fax: 503-249-2999
www.isspro.com © 2008 ISSPRO, Inc. All Rights Reserved.
TURBO BOOST PRESSURE (#2) GAUGE AND SENSOR
INSTALLATION INSTRUCTIONS
Models: R43277 R43377 R43477 R52277 R52377 R52477 R53277
R53377 R53477 R59277 R59377 R59477 R68277 R68377
R68477 R69277 R69377 R69477 R82277 R82377 R82477
1
Disconnect batteries. Do not reconnect battery power until system is
fully configured to avoid risk of shock or fire.
2
Install Electronic Signal Processor (ESP) and ESP harness according to
instructions.
I C O N K E Y
CAUTION
Tools may be required
Shown in picture
3
Connect the Pressure Sensor Harness to the ESP Harness as follows:
a. Remove plugs from cavities 8, 9 and 10 of connector D (brown) of the ESP.
b. Using a pair of needle nose pliers, pull the orange wedge lock out of connector D.
c. Insert the terminal from the red wire (5V sensor supply output) into cavity 8 of connector D
on the ESP, pushing until it snaps into connector D.
d. Insert the terminal from the black wire (sensor supply ground) into cavity 9 of connector D on
the ESP, pushing it until it snaps in place.
e. Insert the terminal from the green wire (sensor input) into cavity 10 of connector D on the
ESP, pushing it until it snaps in place.
f. Note: Terminals will be close to flush with the top of the connector when fully seated.
g. A firm pull of the wire will confirm whether they are properly seated.
h. Push the orange wedge lock back into position. If any of the wires are not fully seated, the
wedge lock will not insert into position.
i. Reconnect connector D (brown) to the ESP.
Figure 1: Connector D top and bottom
view. Shown with plugs and wedge-lock
installed.
Figure 2: Remove plugs and wedge-lock as
shown. Wedge-lock is replaced once wires are
positioned properly.
Page view 0
1 2

Summary of Contents

Page 1 - PERFORMAX

PERFORMAX Form No. IS167 (Rev. A 03/11/2008) ISSPRO, INC.  2515 N.E. Riverside Way  Post Office Box 11177  Portland, Oregon 97211-1899 503-288-

Page 2

Form No. IS167 (Rev. A 03/11/2008) ISSPRO, INC.  2515 N.E. Riverside Way  Post Office Box 11177  Portland, Oregon 97211-1899 503-288-4488  800-

Comments to this Manuals

No comments